Advance Power Solution logo
Government Schemes

PM Surya Ghar Yojana - Complete Guide 2025

PM Surya Ghar Muft Bijli Yojana ke bare mein poori jankari. Eligibility, subsidy amount, application process aur benefits.

10 January 20258 min readPiyush KumawatReviewed by Shyam Maheshwari
MNRE ApprovedPM Surya Ghar25 Yr Warranty
PM Surya Ghar Yojana - Complete Guide 2025

PM Surya Ghar Yojana Kya Hai?

PM Surya Ghar Muft Bijli Yojana February 2024 mein launch hui thi. Iska main goal hai ki 1 crore ghar ko rooftop solar se connect kiya jaye aur har mahine 300 unit tak free bijli di jaye. Rajasthan ke liye yeh scheme khaas important hai kyunki yahan average solar irradiation bahut high hai β€” 5.5 to 6.5 kWh/mΒ²/day.

Kitni Subsidy Milegi?

Subsidy directly aapke bank account mein aati hai installation ke baad:

  • 2 kW tak β€” β‚Ή30,000 per kW (max β‚Ή60,000)
  • 2 kW se 3 kW tak β€” β‚Ή18,000 per kW additional
  • 3 kW se upar β€” koi additional central subsidy nahi, lekin state top-up available

Example: 3 kW system pe total β‚Ή78,000 central subsidy milegi.

Rajasthan government ki taraf se alag se state subsidy bhi available hai. Dono combine karke ek 3 kW system pe 40–50% cost cover ho sakti hai.

Kaun Apply Kar Sakta Hai?

  • Apka khud ka makaan hona chahiye (rent pe nahi)
  • Valid electricity connection (DISCOM registered)
  • Aadhar-linked bank account
  • Chhat pe shadow-free 100–150 sq ft space minimum

Application Process β€” Step by Step

Step 1 β€” PM Surya Ghar Portal pe register karo pmsuryaaghar.gov.in pe jaao, mobile number se OTP verify karo aur account banao.

Step 2 β€” Electricity consumer number enter karo DISCOM consumer number enter karne se aapka address aur load automatically fill hoga.

Step 3 β€” Empanelled vendor choose karo Portal pe MNRE-approved vendors ki list milegi. Advance Power Solution Rajasthan mein empanelled vendor hai.

Step 4 β€” Installation Vendor site visit karega, system design karega aur installation complete karega. Normally 5–10 working days lagte hain.

Step 5 β€” Net Metering application Installation ke baad DISCOM ko net metering ke liye apply karna hoga. Advance Power Solution yeh process bhi handle karta hai.

Step 6 β€” Subsidy disbursement DISCOM inspection aur net meter installation ke baad subsidy 30 days mein bank account mein aa jaati hai.

Kitni Savings Hogi?

Rajasthan mein average bijli bill β‚Ή2,000–₹4,000/month hota hai. 3 kW solar system:

  • Monthly generation: ~360–420 units
  • Monthly savings: β‚Ή1,800–₹2,500
  • Payback period: 4–5 saal (subsidy ke baad)
  • System life: 25 saal

Important Documents

  • Aadhar card
  • Electricity bill (last 3 months)
  • Bank passbook/cancelled cheque
  • Property ownership proof (ration card/registry)
  • Passport size photo

Advance Power Solution Se Apply Kaise Karein?

Hum ek call mein poora process handle karte hain β€” portal registration se lekar subsidy disbursement tak. Free site visit ke liye abhi call karein: 8209844146

PM Surya GharSubsidyGovernment SchemeFree Bijli
Call for Free Quote
P

About the Author

Piyush Kumawat is a solar energy specialist contributing practical guides, subsidy updates and solar installation insights for Rajasthan homeowners and businesses.

β˜€οΈ Aaj Hi Decision Lo!

Bijli Bill Se Hamesha ke Liye
Azaad Ho Jao!

Aaj free site visit book karo. Expert aapke ghar aayega β€” koi pressure nahi, koi charge nahi. Sirf solar ka ek decision β€” aur 25 saal ki savings!

βœ… 100% Free Site VisitπŸ’° β‚Ή78,000 Subsidy⚑ 1–3 Din InstallπŸ† 25 Yr WarrantyπŸ“± Smart App Included
+91 82098 44146

🌟 12,000+ Rajasthan families ne already apna decision le liya

Average Customer Saves

β‚Ή3,500/month
Pehle bijli billβ‚Ή4,000
Solar ke baadβ‚Ή400

* Rajasthan average; actual savings may vary by system size & usage

Google Verified

β€œAPS ne humare ghar mein 5kW system lagaya. Bijli bill zero ho gaya! Team bahut professional thi aur kaam time pe complete hua.”

R

Ramesh Kumar Sharma

Jaipur, Rajasthan Β· 5kW System

πŸ›οΈ MNRE Approvedβ˜€οΈ PM Surya Ghar⭐ 4.6 GoogleπŸ”’ 25yr Warranty